PROJECT: Harbour Access Works

PROJECT

Harbour Access Works – Norway

CLIENT: Confidential – Marine & Infrastructure Sector


THE PROJECT

Fast Access Ltd was awarded a contract to provide a specialist suspended access solution for framework and maintenance works along a Norwegian harbour quay.

The works required a safe, efficient, and over-water access system that could be installed with minimal disruption to harbour operations while withstanding challenging coastal conditions.


THE SOLUTION

We deployed our Fast-Beam™ system with BMO bracket hanger assemblies fixed to the harbour parapet, allowing suspended deck installation directly over the water.

Key operational benefits included:

  • Minimal on-site footprint – reducing disruption to ongoing harbour activities.

  • Safe over-water working – eliminating the need for floating platforms or barges.

  • Rapid installation – allowing works to commence without delay.

 

THE OUTCOME

The project demonstrated Fast-Beam™’s ability to deliver:

  • Safe, stable access platforms in marine environments

  • Time and cost efficiencies over traditional over-water access methods

  • Environmental protection through non-intrusive installation methods

By combining innovative suspended access technology with TAS’s expert installation capabilities, the Norway Harbour project was delivered on time, on budget, and to the highest safety standards.


📩 For more information:
🌍 www.fast-access.com | www.fast-beam.com
📧 callum@fast-access.com

Leave a comment

Need a turnkey solution? Start a conversation today

Our systems and services built for performance on every site

Newsletter Signup
Contact Us

T. +44 (0)7483 148851

E. mick@fast-access.com

Fast Access © 2025. All rights reserved.

eCommerce Website built by Nu Life Digital