PROJECT
Harbour Access Works – Norway
CLIENT: Confidential – Marine & Infrastructure Sector
THE PROJECT
Fast Access Ltd was awarded a contract to provide a specialist suspended access solution for framework and maintenance works along a Norwegian harbour quay.
The works required a safe, efficient, and over-water access system that could be installed with minimal disruption to harbour operations while withstanding challenging coastal conditions.
THE SOLUTION
We deployed our Fast-Beam™ system with BMO bracket hanger assemblies fixed to the harbour parapet, allowing suspended deck installation directly over the water.
Key operational benefits included:
Minimal on-site footprint – reducing disruption to ongoing harbour activities.
Safe over-water working – eliminating the need for floating platforms or barges.
Rapid installation – allowing works to commence without delay.
THE OUTCOME
The project demonstrated Fast-Beam™’s ability to deliver:
Safe, stable access platforms in marine environments
Time and cost efficiencies over traditional over-water access methods
Environmental protection through non-intrusive installation methods
By combining innovative suspended access technology with TAS’s expert installation capabilities, the Norway Harbour project was delivered on time, on budget, and to the highest safety standards.