Skip to content Skip to sidebar Skip to footer

Innovating Access. Delivering Excellence. Expanding Globally.

 

FAST ACCESS SECURES STRATEGIC PARTNERSHIP WITH ALTRAD QATAR

Fast Access Ltd is proud to announce a strategic partnership with Altrad Qatar, a global leader in industrial services.

This collaboration builds on our shared commitment to safety, innovation, and efficiency and has already delivered remarkable results, including the North Oil Company (NOC) Offshore WEB Deck™ Project in the Persian Gulf.

Fast Access is positioned to deliver cutting-edge suspended access systems across the Middle East and internationally.

Key benefits of this partnership include:

  • Access to global offshore and industrial markets.
  • Enhanced delivery speed — with proven up to 90% faster installations.
  • Significant weight reductions over conventional scaffolding, reducing offshore logistics challenges.
  • Improved safety performance — zero Lost Time Incidents to date.

PROJECT SPOTLIGHT – NORTH OIL COMPANY OFFSHORE WEB DECK PROJECT

Fast Access, in partnership with Altrad Qatar, supported NOC in delivering a WEB Deck™ suspended access platform for coating and insulation works on the underdeck of the Charlie platform cellar deck.

Project Stats:

  • Deck Area: 420m² WEB Deck™
  • Crew: 8 WEB Deck installers + 1 supervisor
  • Installation Time: 8 shifts (vs 82 shifts for scaffold)
  • Weight Savings: 8.5 tonnes (vs 70 tonnes scaffold)
  • Contact Point Reduction: 983 to 120 (80% fewer)
  • Time Savings: 90% faster than traditional scaffold
  • Safety: Zero Lost Time Incidents

This project is a flagship example of how our technology and partnerships deliver safer, faster, lighter, and more efficient offshore access solutions.

DIRECTOR’S MESSAGE – MICK FLAHERTY

“The last quarter has been one of the most successful in our history.”


“We’ve expanded into offshore markets, delivered record-breaking installation times in Finland and Norway, and secured partnerships with industry leaders that will shape our future globally.”

“Thank you to all our clients, partners, and the dedicated Fast Access and TAS teams. Your trust, expertise, and commitment to innovation make these achievements possible.”

GLOBAL PROJECT HIGHLIGHTS

Destia Oy – Finland

  • 200m Fast-Beam™ installed in 2.5 days across two bridges.
  • Advanced hydro-demolition in a fully contained workspace.

Sysmänjoensilta Bridge – Finland

  • 47m Fast-Beam™, full encapsulation, 6-hour install by a 3-man crew.

Dragsvik Harbour – Norway

  • 60m Fast-Beam™ over water, 12 platforms in 2 days, 4-man crew.

Katfoss, Vickersund – Norway

  • 480m Fast-Beam™, 33 hangers, 32 platforms, 5-day install by 6-man crew.

Sealed Tight – Watertight Parapet Works

  • Precision-sealed deck for hydro-demolition and concrete works.

Integrated Hydro-Demolition Platform

  • Operator-safe, fully integrated into Fast-Beam™ system.

3,400m² Suspended Decking – Manufacturing & Energy Sector

  • WEB™ roof system as a temporary works solution during major roof replacement.

Norway Harbour Quay Project

  • Over-water suspended access with BMO hanger brackets, zero marine disruption.

CAPE Altrad Qatar – Offshore WEB Deck Training

  • Rope Access teams trained for offshore deployment, expanding operational reach.

LOOKING AHEAD

With confirmed upcoming works in Qatar, Scandinavia, and the UK, plus several first-time deployments of enhanced Fast-Beam™ configurations, the next quarter will be another busy and exciting period.

We remain committed to delivering smarter, safer, and more efficient access solutions worldwide.

Working in collaboration with  TAS – Total Access Systems Ltd, our ISO 9001, ISO 45001, and Safe Contractor-accredited installation partner, 

Leave a comment

Need a turnkey solution? Start a conversation today

Our systems and services built for performance on every site

Newsletter Signup
Contact Us

T. +44 (0)7483 148851

E. mick@fast-access.com

Fast Access © 2025. All rights reserved.

eCommerce Website built by Nu Life Digital